{
  "reviewed_on": "2026-11-08",
  "excluded_claims": [
    {
      "topic": "Estimated emissions reduction",
      "reason": "The contractor and trade press give different estimates. The reviewed sources do not reconcile their calculation methods.",
      "source_ids": [
        "AREEESOLAR",
        "ARTASOLAR"
      ]
    },
    {
      "topic": "Measured annual generation and completion of Phase II",
      "reason": "The sources used for this article give an expected annual yield and describe Phase II as planned.",
      "source_ids": [
        "AREEESOLAR",
        "ARTASOLAR"
      ]
    }
  ],
  "articles": [
    {
      "slug": "al-rostamani-ose-rooftop-solar-phase-one",
      "title": "Al Rostamani Group and the first phase of rooftop solar at OSE Industries",
      "category": "Business",
      "excerpt": "Emirates Electrical Engineering carried out the first phase of rooftop solar at OSE Industries. The 2024 reporting records the launch, rated capacity and expected output.",
      "familySlug": "al-rostamani",
      "familyName": "Al Rostamani",
      "familyAudit": "/content-audits/2026-11-04-002.json",
      "sections": [
        {
          "heading": "The Al Rostamani Group connection",
          "claimId": "AR-06",
          "text": "Emirates Electrical Engineering identifies itself as a member of Al Rostamani Group in its account of the OSE Industries project.",
          "sources": [
            {
              "id": "AREEESOLAR",
              "url": "https://eee-uae.com/knowledge-hub/emirates-electrical-engineering-strengthens-renewable-energy-leadership-with-high-profile-solar-projects/",
              "publisher": "Emirates Electrical Engineering",
              "locator": "Opening paragraph immediately below the project summary",
              "assessment": "Contractor self-description of its group affiliation."
            }
          ]
        },
        {
          "heading": "The first phase goes live",
          "claimId": "AR-07",
          "text": "TradeArabia reported in August 2024 that Emirates Electrical Engineering carried out the first phase of the OSE Industries rooftop solar project and that the installation went live in early July 2024.",
          "sources": [
            {
              "id": "ARTASOLAR",
              "url": "https://tradearabia.com/News/288924/Dubal-Extrusion-Investment-completes-rooftop-solar-project/HEAL",
              "publisher": "TradeArabia",
              "locator": "29 August 2024 report → first two body paragraphs",
              "assessment": "Trade press coverage. The report does not document a separate technical inspection."
            },
            {
              "id": "AREEESOLAR",
              "url": "https://eee-uae.com/knowledge-hub/emirates-electrical-engineering-strengthens-renewable-energy-leadership-with-high-profile-solar-projects/",
              "publisher": "Emirates Electrical Engineering",
              "locator": "Paragraph beginning “EEE successfully completed Phase I”",
              "assessment": "The contractor separately reports completion in July 2024."
            }
          ]
        },
        {
          "heading": "Rated capacity and expected generation",
          "claimId": "AR-08",
          "text": "The installation was rated at 633 kWp, and the expected annual generation was 1.1 GWh.",
          "sources": [
            {
              "id": "ARTASOLAR",
              "url": "https://tradearabia.com/News/288924/Dubal-Extrusion-Investment-completes-rooftop-solar-project/HEAL",
              "publisher": "TradeArabia",
              "locator": "29 August 2024 report → paragraph beginning “With a rated capacity”",
              "assessment": "Reported design rating and expected output."
            },
            {
              "id": "AREEESOLAR",
              "url": "https://eee-uae.com/knowledge-hub/emirates-electrical-engineering-strengthens-renewable-energy-leadership-with-high-profile-solar-projects/",
              "publisher": "Emirates Electrical Engineering",
              "locator": "Project summary above the opening paragraph",
              "assessment": "The contractor gives the same rating and expected generation."
            }
          ]
        }
      ]
    }
  ]
}
